Description
Premium highway Frontage. Building was extensively burned and will likely need to be torn down. Some systems such as the AC unit may still be usable but absolutely no guarantees are being offered regarding the salvageability of the structure. Utilities have been turned off but are at the property line. Metal roof has been removed.
-
0BEDS
-
0.09ACRES
-
0BATHS
-
01/2 BATHS
School Ratings & Info
Description
Premium highway Frontage. Building was extensively burned and will likely need to be torn down. Some systems such as the AC unit may still be usable but absolutely no guarantees are being offered regarding the salvageability of the structure. Utilities have been turned off but are at the property line. Metal roof has been removed.